Highlights:
- Gang: 3
- Installed after the concrete pour allowing you to follow your traditional production schedule
- Boxes can be installed anywhere on the ICF wall allowing for more variety in box positioning as installers are no longer required to affix to the ICF ties or drill and secure to the concrete wall
- Boxes are fully certified to UL standards for use in ICF and can resist pull forces exceeding 100 lbs (twice the standard requirement)
Reviews
There are no reviews yet.